NDM Construction Inc is a licensed commercial concrete contractor serving San Jose and the greater Silicon Valley area. If your project involves a concrete slab, a loading dock, a parking area, or a foundation pour, we scope it, permit it, and build it to spec. Call (408) 608-9319 and Jose will talk through what your job actually needs.
Commercial concrete isn't one thing. A warehouse floor on grade has different reinforcement, finish, and load requirements than a retail storefront approach or a concrete retaining wall holding a graded hillside. The right mix design, the right PSI spec, and the right curing protocol are non-negotiable on permitted commercial work in Santa Clara County. Bay Area soils add another layer: expansive clay in much of San Jose moves seasonally, which means subgrade prep and proper compaction aren't optional steps. We account for seismic reinforcement requirements and local inspection sequences before we pour anything. What drives cost on a commercial pour is scope (square footage and depth), site access, soil conditions, reinforcement complexity, and finish specification. Every job is different -- contact NDM Construction Inc for an accurate estimate.
WHAT WE BUILD
Commercial Concrete Services for San Jose Projects Commercial Concrete06
From initial grading to the final finish, we handle the concrete scope on commercial jobs of real complexity.
01
Concrete Slabs and Flatwork
Slab-on-grade construction for warehouses, retail spaces, and commercial tenant suites. We spec the rebar grid, control joints, and surface finish to match the occupancy load. Interior slabs for tenant improvement buildouts get the level tolerance that finished flooring requires.
Commercial foundation concrete in the Bay Area starts with understanding what's under the slab. We work from soils reports, carry the seismic detailing through the pour, and coordinate inspections with San Jose Building Division so nothing holds up your schedule.
A loading dock gets hit by truck traffic, fork equipment, and weather daily. We build dock aprons and pit pads to industrial thickness specs, with proper slope for drainage and armored edges that don't chip out after six months.
Learn more
04
Driveways and Parking Areas
Commercial driveways and surface lots require ADA-compliant cross slopes, accessible route transitions, and often striping layout coordination. We handle the concrete scope and flag what the general site plan needs from you before we start.
Graded commercial sites often need engineered retaining. Our concrete retaining wall work follows the structural drawings, uses proper drainage behind the wall, and gets inspected at the right stages -- no shortcuts that get flagged at certificate of occupancy.
Learn more
06
Concrete Repair and Restoration
Spalled slabs, heaved walkways, cracked aprons -- commercial concrete repair is often more cost-effective than a full pour when the substrate is sound. We assess honestly. If a section can be ground and patched to spec, we'll tell you. If it needs to come out, we say that too.
Our Process
Permitting and Inspections for Commercial Concrete in San Jose
Step 01
Plan Review and Permit Application
Commercial concrete projects in San Jose typically require building permits through the city's Development Services Department. We pull the permit, submit the structural and civil drawings, and track the review timeline so your project doesn't stall waiting on paperwork.
Step 02
Subgrade and Inspection Holds
Santa Clara County inspectors require subgrade compaction verification before any pour on commercial foundations or thick slabs. We schedule inspections at the right stages -- rough foundation, pre-pour, and final -- and we don't pour until the inspector signs off.
Step 03
Final Approval and ADA Sign-Off
Commercial flatwork that involves accessible routes, parking, or building entries needs to meet ADA cross-slope and surface requirements at final inspection. We build to those tolerances from the start, not as a correction after the fact.
SITE CONDITIONS
Bay Area Soils and Seismic Concrete Requirements
San Jose sits on a mix of alluvial soils, expansive clay, and fill in some commercial corridors -- and your concrete's performance depends entirely on what's under it. Expansive clay swells when wet and shrinks when dry, which cracks slabs poured without adequate subbase prep or proper joint layout. We don't skip the compaction step. For foundation work, we follow the soils report. If a report hasn't been done and the project warrants one, we'll tell you before you pour.
Seismic reinforcement requirements in California also affect how commercial slabs and foundations are detailed. The rebar schedule, lap splices, and tie spacing aren't suggestions -- they're inspected. Our crews know the CBC detailing requirements and build to them. NDM Construction holds a 4.9-star rating across 10 Google reviews, and Jose Hernandez is licensed in California as the responsible managing officer on every permit we pull.
What Separates a Good Pour from a Problem You Fix in Three Years
01
Correct mix design for the application
A parking lot apron and an interior warehouse floor have different PSI requirements, air entrainment needs, and admixture specs. Using a generic ready-mix order on a job that needs a specific design is how you get surface scaling and freeze-thaw damage.
02
Proper subgrade preparation
Compaction tests and a clean, uniform subbase prevent differential settlement. This is the step that gets rushed when a crew is behind schedule -- and the one you'll feel for the next decade if it's wrong.
03
Control joint layout that matches the slab geometry
Concrete cracks. Control joints tell it where to crack -- along a straight, planned line rather than across the middle of a bay. Joint spacing and depth matter. Guessing on layout is how you get random cracks through a finished floor.
04
Curing protocol matched to site conditions
San Jose's climate is generally favorable for curing, but hot dry days in summer can pull moisture out of a fresh pour too fast and cause surface crazing. We wet-cure or use curing compounds based on ambient conditions, not habit.
Service area
Serving Commercial Projects Across Silicon Valley
We take on commercial concrete scopes throughout San Jose and the surrounding South Bay. Permitted work, coordinated inspections, commercial timelines.
What permits are required for commercial concrete work in San Jose?
Most commercial concrete scopes -- foundations, slabs over a certain size, retaining walls over 4 feet -- require building permits through the City of San Jose Development Services Department. The permit triggers plan review and scheduled inspections at subgrade, pre-pour, and final stages. Unpermitted commercial concrete work creates serious liability at sale or tenant build-out. We pull the permits and manage the inspection sequence.
How do Bay Area expansive clay soils affect commercial concrete design?
Expansive clay, common across much of Santa Clara County, swells when saturated and shrinks when dry. That movement transfers uplift pressure to slabs and foundations. Proper mitigation includes adequate subbase depth, moisture barriers, and sometimes post-tensioned slab design on sites with high plasticity soils. A soils report tells you what you're dealing with -- we work from that data rather than guessing at subbase thickness.
How long does commercial concrete need to cure before loading?
Standard concrete reaches about 70% of design strength at 7 days and approaches full strength at 28 days. For light foot traffic and light equipment, 24 to 48 hours is typically sufficient after a proper pour. For fork traffic, heavy racking loads, or vehicle traffic, we recommend waiting closer to 7 days minimum and confirming with the mix design spec. Rushing load application on a fresh pour is how you get permanent surface damage.
What ADA requirements apply to commercial concrete flatwork?
Accessible routes, parking spaces, and building entries must meet ADA cross-slope limits -- no more than 2% in the direction of travel and 2% perpendicular -- and surface texture requirements that allow stable footing. Running slopes on accessible paths are limited based on the route type. These tolerances are inspected on commercial projects. We build accessible concrete surfaces to final inspection standard, not as an afterthought.
What's the difference between a concrete slab on grade and a structural slab?
A slab on grade sits directly on the prepared subgrade and is supported by the earth below it -- the subgrade does most of the structural work. A structural slab spans between supports, like a suspended parking deck or upper-level floor, and carries loads entirely through its own reinforcement and geometry. Most commercial ground-floor construction uses slab on grade. The distinction matters because the design, reinforcement schedule, and inspection requirements are completely different.
How do you prevent concrete cracking in commercial installations?
No concrete pour is crack-free forever -- the goal is controlling where cracks form and keeping structural cracks from developing. The tools are proper subgrade prep, correct mix design, adequate reinforcement or post-tensioning, precisely laid control joints, and appropriate curing. Skipping or rushing any of those steps shifts the cracking from planned joints to random locations across the slab. We don't skip steps to make a pour date work.
How long does commercial concrete need to cure before it can be loaded?
Standard concrete reaches about 70% of design strength at 7 days and approaches full strength at 28 days. For light foot traffic, 24 to 48 hours is typically sufficient. For fork traffic, heavy racking loads, or vehicle traffic, we recommend waiting closer to 7 days minimum and confirming with the mix design spec. Rushing load application on a fresh pour is how you get permanent surface damage.
What ADA requirements apply to commercial concrete flatwork and accessible routes?
Accessible routes, parking spaces, and building entries must meet ADA cross-slope limits -- no more than 2% in the direction of travel and 2% perpendicular -- and surface texture requirements that allow stable footing. Running slopes on accessible paths are limited based on the route type. These tolerances are inspected on commercial projects. We build accessible concrete surfaces to final inspection standard from the start.
What is the difference between a slab on grade and a structural slab?
A slab on grade sits directly on the prepared subgrade and relies on the earth below for support. A structural slab spans between supports, like a suspended parking deck, and carries loads entirely through its own reinforcement and geometry. Most commercial ground-floor construction uses slab on grade. The distinction matters because the reinforcement schedule, design requirements, and inspection criteria are completely different between the two.
How do you prevent cracking in commercial concrete installations?
No concrete pour is crack-free forever -- the goal is controlling where cracks form. The tools are proper subgrade prep, correct mix design, adequate reinforcement, precisely laid control joints at the right spacing and depth, and correct curing protocol for the ambient conditions. Skipping or rushing any of those steps shifts cracking from planned joints to random locations across the slab. Every job is different -- contact NDM Construction Inc for an accurate estimate.
Commercial Concrete Scopes in San Jose: Call Before You Pour
Permitted commercial concrete work moves on a schedule. The sooner we scope the job, the fewer surprises hit you mid-project.