San Jose's soil conditions are the first thing any honest contractor will discuss with you.
Much of San Jose sits on Vertisol-class clay. Wet season swells it. Summer dries it out and it contracts. A slab laid directly on that clay without proper base prep will crack within a couple of seasons, regardless of the concrete mix. We dig out the unstable material, bring in compacted Class II base rock, and set rebar or wire mesh before we pour. That's not optional, and any contractor who skips it is handing you a problem about 18 months from now. We're also careful about drainage pitch. Santa Clara County gets 14 to 15 inches of rain annually, most of it in a short window. A patio that doesn't shed water away from the foundation isn't just an inconvenience. It's a liability. Slope, drainage channels, and adjacent
masonry work are all part of the conversation before we break ground.